You must have JavaScript enabled to view certain links and/or sign up for the Succeed Newsletter.
Grants.Gov

   Home  > Find Grant Opportunities > Search Grant Opportunities > Search Results > Synopsis

Recovery Act: Large Wind Turbine Drivetrain Testing Facility

Department of Energy

 
Synopsis
       


The synopsis for this grant opportunity is detailed below, following this paragraph. This synopsis contains all of the updates to this document that have been posted as of 06/23/2009 . If updates have been made to the opportunity synopsis, update information is provided below the synopsis.

If you would like to receive notifications of changes to the grant opportunity click send me change notification emails . The only thing you need to provide for this service is your email address. No other information is requested.

Any inconsistency between the original printed document and the disk or electronic document shall be resolved by giving precedence to the printed document.

Document Type: Modification to Previous  Grants Notice
Funding Opportunity Number: DE-FOA-0000112
Opportunity Category: Discretionary
Posted Date: Jun 23, 2009
Creation Date: Aug 12, 2009
Original Closing Date for Applications: Aug 13, 2009    to meet program requirements
Current Closing Date for Applications: Aug 25, 2009    To meet program requirements
Archive Date: Oct 23, 2009
Funding Instrument Type: Grant
Category of Funding Activity: Energy
Category Explanation:
Expected Number of Awards:
Estimated Total Program Funding:
Award Ceiling: $45,000,000
Award Floor: $0
CFDA Number(s): 81.087  --  Renewable Energy Research and Development
Cost Sharing or Matching Requirement: Yes

Eligible Applicants

State governments
County governments
City or township governments
Special district governments
Public and State controlled institutions of higher education
Private institutions of higher education
Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled "Additional Information on Eligibility"
 

Additional Information on Eligibility:


Agency Name

Golden Field Office

Description

This Funding Opportunity Announcement is for the design and construction of a large dynamometer facility for testing 5 to 15 MW rated drivetrains, with supporting systems, and the operation and maintenance of these facilities for the benefit of wind stakeholders nationwide. The proposed facility can be new construction or involve the design and modification of an existing building suitable for electrical, mechanical, and other physical needs associated with a dynamometer test stand. Overhead cranes, access doors, and other facility infrastructure suitable for accommodating associated components and equipment will be required. It is envisioned that the facility will include sufficient office space for permanent staff and visiting users as well as conference rooms, lunch room, restrooms, computer stations, etc. Applicants will be required to submit detailed multi-phase plans including concept designs, preliminary designs, engineering procurement and construction contract management, and operation and maintenance. DOE envisions awarding a single $45 Million financial assistance grant award on a competitive basis. This $45 million program is to assist in the design and construction of an accredited dynamometer testing facility capable of performing Highly Accelerated Life Testing (HALT) of 5 to 15MW rated wind turbine drive trains and generators, including all required supporting systems. As HALT is assumed to require at least a 30% overload in the rated torque of the test article, the dynamometer facility will require a minimum capacity of 20MW to support testing of a 15MW rated drivetrain. The facility should incorporate features to accommodate large direct drive generators in addition to generator/gearbox drivetrain configurations. In addition, the capability to simultaneously impart dynamic and/or steady off-axis loads (bending, radial and axial loads) to the low speed shaft of the test article will be required. It is anticipated that the facility will incorporate multiple test bays, permitting simultaneous, independent testing of two 7.5MW rated drivetrains. It is expected that the test bay dynamometers would be coupled to obtain a single test capability of up to 15MW rated drivetrains. The facility should incorporate the necessary electrical infrastructure to permit interconnection of the test article at all common system operating voltages. The facility should also be capable of testing generator system response to grid anomalies and for grid code compliance. Independent accreditation of the facility to conduct certification testing in accordance with applicable wind turbine design standards will be required.

Link to Additional Information

Click here to view the Opportunity

If you have difficulty accessing the full announcement electronically, please contact:

using this
link
support@fedconnect.net
Sara Wilson
sara.wilson@go.doe.gov
If you have any problems linking to the funding opportunity please contact the FedConnect HelpDesk

Synopsis Modification History

The following files represent the modifications to this synopsis with the changes noted within the documents. The list of files is arranged from newest to oldest with the newest file representing the current synopsis. Changed sections from the previous document are shown in a light grey background.

File Name Date
Modification #3 Aug 12, 2009
Modification #2 Jul 07, 2009
Modification #1 Jul 07, 2009
Original Synopsis Jun 23, 2009